David Allen Reed Hall Records
Collection Scope and Contents
This collection documents the planning, construction, and significance of David Allan Reed Hall. The collection includes general information, a dedication program, floor plans, and an outside newspaper article regarding the dormitory’s completed construction and dedication. Visual images of the dormitory include undated exterior photographs of the front, east, west, and south sides of the dormitory, as well as slides.
Dates
- Creation: 1961-2012
Creator
- Springfield College (Creator, Organization)
- Springfield College Archives and Special Collections (Collector, Organization)
Conditions Governing Access
Unrestricted
Conditions Governing Use
Rights status not fully evaluated.
Read our full copyright statement.
Historical Note
Construction began on David Allen Reed Hall on August 1st, 1961 and was completed in a little over a year on September 1st, 1962. The dedication took place on October 20th, 1962. The building was originally to be named Massasoit Hall, but was changed to Reed Hall on June 10th, 1961, when the trustees decided that the last dormitory constructed in the tri-pod of dormitories should be named after the College’s founder in order to allow time to collect proper funds in his name.
David Allen Reed founded Springfield College in 1885 and at the dedication of the dormitory it was said: “today 77 years after a dream come true it is fitting that tribute to this pioneering educator and religious leader be given at the college he founded.”
Today it is also fitting that the dormitory houses freshmen, the visionaries of the future in the world as well as visionaries of future in the college. Each year the freshmen give new life and see new possibilities for the college in the same way that David Allen Reed saw the possibility of a beautiful location for a school from the unpromising track of land which in 1885 was covered in sand dunes and scrub pines, and a city dump was located where some of the newest, most beautiful buildings now stand.
Chronology
1961: August 1st, 1961 construction begins.
1961: June 10th, 1961 dormitory named Reed Hall.
1962: September 1st, 1962 construction completed.
1962: October 20th, 1962 dedication ceremony.
Extent
.25 Linear Feet (1 box)
Language of Materials
English
Metadata Rights Declarations
Arrangement
Since this is an artificially created collection there is no original order. The collection is organized as follows: floor plans, news articles, and photographs and slides. Other than digitized items, there is no particular order within the folders.
History of the Collection
There was no formal acquisition of the materials for this collection. The collection is artificially created. Materials were received from different places at different times. The Acquisition sources and dates of the materials are unknown.
Digitized Materials
Browse digitized materials from this collection. This collection is partially digitized.
Digital Materials Searches
Subject
- Springfield College (Organization)
- Reed, David Allen (Person)
Topical
Uniform Title
- Title
- David Allen Reed Hall Records
- Status
- Completed
- Author
- Amanda DiPaolo
- Date
- 2009-12
- Description rules
- Describing Archives: A Content Standard
- Language of description
- English
- Script of description
- Latin
Revision Statements
- 2012-02: Revisions made to the finding aid by Jeffrey Monseau.
- 2022-07: Transferring information from the original Word document to ArchivesSpace.
Repository Details
Part of the Springfield College Archives and Special Collections Repository
Springfield College
Judd Gymnasia
263 Alden Street
Springfield Massachusetts 01109 U.S.A. US
413-748-3309
jmonseau@springfieldcollege.edu